Phase 1 — Documents
Drawings, renderings, the technical description, permit decisions, and the current offers for the complement buildings.
Guest view8 owner-only documents hidden — open Owner Mode to see them.
Drawings
PDF · 7.8 MB
FÖRSLAGSHANDLING 2026-06-29 — full design proposal set, 23 pp: house ombyggnad + komplementbyggnad (studio/bastu), plans 1–3, sections A/B, all façades incl. existing-state (Sandell, uppdrag 2132)
PDF · 317 KB
Studio — adjusted position & height, +31.20 (A-40-1-401, drawn 2025-09-16; approved by the inspector after startbesked, delivered 2025-11-07)
PDF · 2.0 MB
Nybyggnadskarta — situationsplan with the adjusted studio position (drawn 2025-09-16; approved by the inspector after startbesked, delivered 2025-11-07)
Renderings
Specifications
Permit decisions