Phase 2 — house renovation
Renovate the existing 1949 fritidshus within its footprint — enclose the altan, finish the room below it, open up the plan. Planning stage.
Scope
same footprintPreconditions — moisture remediation
2021 besiktningPermits
Phase 2 — not yet lodgedRequired for the Phase 2 renovation — enclosing the altan changes the fasad. A new ärende, separate from BYGG.2025.1705 (Phase 1 komplementbyggnader). Robert Sandell to lodge. Open question first: does enclosing the altan add BYA (and so re-open strandskydd)? No NEW strandskyddsdispens expected — same footprint, established hemfridszon — but confirm with Värmdö + Robert in writing before lodging, given the Dec 2024 new-build overturn.
Separate track from bygglov, required for the structural work — removing/ relocating load-bearing timmer walls and inserting beams. Triggers a kontrollplan. A structural engineer must size the beams (liggande timmer is monolithic — not a stud-wall job). KA engagement to be confirmed or a new uppdragsavtal signed.
Phase 2 sections
Visualization
native 3D modelThe existing house built as native geometry from Robert Sandell's measured drawings. Switch between Existing and Proposed, toggle Realistic materials (matched to the house — terracotta roof, timber cladding, yellow window frames, green souterräng covers), Colour by status (retained / demolish / new), and the Top floor. Drag to orbit.